CAS Additional Services
1. Uninterruptible power supplies |
1.1. Installation of UPS from 1 KVA – 1100KVA |
1.2. UPS maintenance from 1 KVA to 1100KVA |
1.3. Battery Study |
1.4. Bank Tests with Resistive Loads |
1.5. Start Via Open Loop Test |
1.6. Diagnosis and repair |
1.7. Equipment startup and configuration |
2. Electrical Projects |
2.1. BIM (Bilding Information Modeling) |
2.2. Electrical Installation Verification Unit (UVIE) |
3. Electrical installations |
3.1. Medium Voltage Cable |
3.2. Medium voltage terminals |
3.3. Medium voltage splices |
3.4. Disconnectors in media |
3.5. Transformers |
3.6 Ground Systems |
3.7 Lightning Rod Systems |
3.9.- Distribution Boards |
3.10.- Use circuit for equipment and machinery |
4. Power Quality Analysis |
4.1. Power Quality |
4.2. Infrared thermography to detect hot or cold spots |
4.3. Ground System Measurement |
4.4. Evaluation of electrical installations according to NOM 001 SEDE 2012 |
5.- Deliverables |
5.1.- Control and risk sheets at the beginning and end of the work |
5.2.- Digital documentation of the company |
5.3.- Unifilar flow diagrams of the elements in which it was intervened |
5.4..- Recommendations according to the NOM if applicable |
5.5.- Equipment calibration certificate |
5.6.- Material recycling letter for confinement (SEMARNAT) |
6.- Electrical Maintenance |
6.1. Substations |
6.2. Transformers |
6.3.- Ground Systems |
6.4.- Lightning arresters |
6.5.- Distribution Boards |
6.6. Testing of medium and low voltage conductors |
6.7.- Personnel on site for maintenance in General |
6.8.- Energy management in computing centers and what is inherent to them+ |