CAS Additional Services

1. Uninterruptible power supplies

1.1. Installation of UPS from 1 KVA – 1100KVA

1.2. UPS maintenance from 1 KVA to 1100KVA

1.3. Battery Study

1.4. Bank Tests with Resistive Loads

1.5. Start Via Open Loop Test

1.6. Diagnosis and repair

1.7. Equipment startup and configuration

2. Electrical Projects

2.1. BIM (Bilding Information Modeling)

2.2. Electrical Installation Verification Unit (UVIE)

3. Electrical installations

3.1. Medium Voltage Cable

3.2. Medium voltage terminals

3.3. Medium voltage splices

3.4. Disconnectors in media

3.5. Transformers

3.6 Ground Systems

3.7 Lightning Rod Systems

3.9.- Distribution Boards

3.10.- Use circuit for equipment and machinery

4. Power Quality Analysis

4.1. Power Quality

4.2. Infrared thermography to detect hot or cold spots

4.3. Ground System Measurement

4.4. Evaluation of electrical installations according to NOM 001 SEDE 2012

5.- Deliverables

5.1.- Control and risk sheets at the beginning and end of the work

5.2.- Digital documentation of the company

5.3.- Unifilar flow diagrams of the elements in which it was intervened

5.4..- Recommendations according to the NOM if applicable

5.5.- Equipment calibration certificate

5.6.- Material recycling letter for confinement (SEMARNAT)

6.- Electrical Maintenance

6.1. Substations

6.2. Transformers

6.3.- Ground Systems

6.4.- Lightning arresters

6.5.- Distribution Boards

6.6. Testing of medium and low voltage conductors

6.7.- Personnel on site for maintenance in General

6.8.- Energy management in computing centers and what is inherent to them+